Passing a verification test on the first visit is rarely about luck. It comes down to preparation. Sacramento homeowners and builders often focus on permits and schedules, then find out on test day that a duct connection is loose or the system is not ready to run. Each surprise can mean a second appointment, a delayed inspection and extra frustration.
This guide explains what to do before an Energy Code Compliance (ECC) rater arrives, which tests appear most often and how to avoid the mistakes that lead to failed results. Whether you are installing a new HVAC system, building an accessory dwelling unit or finishing a remodel, a little readiness saves a lot of trouble.
Since January 1, 2026, California has handled field verification and diagnostic testing through the Energy Code Compliance Program under the 2025 Energy Code. HERS providers are now recognized as ECC providers, and HERS raters are recognized as ECC raters. Picture the rater as an independent referee. The contractor installs the equipment, and the rater confirms it performs the way the paperwork promised.
The tests a project needs are listed on its certificate of compliance. The installing contractor and the rater carry out those tests together, and the results go into an ECC provider’s registry. One ECC training resource also notes that group sampling for alterations has been removed and that refrigerant charge verification methods have been revised, so contractors should not assume last year’s routine still applies.
Every project is different, but a few tests show up again and again.
Ducts work like the hidden highways of a home. During this test, the rater pressurizes the system and measures how much air escapes. ENERGY STAR reports that in a typical house, about 20 to 30 percent of the air moving through ducts is lost to leaks, holes and poor connections. One California rater company estimates that this test alone can take about one to two hours.
Airflow checks confirm that enough air moves across the system’s coil for it to work properly. Refrigerant charge verification confirms the air conditioner or heat pump holds the right amount of refrigerant. According to one ECC resource, a fault indicator display alone may no longer be enough to demonstrate compliance, so ask your HVAC contractor which verification method will be used.
Depending on the scope of work, other items such as thermostats, ventilation and additional HVAC features may also appear on the compliance documents. Always confirm the full list before scheduling.
Use this list a few days before the appointment.
Every item above helps the visit go toward testing rather than waiting around.
Picture a duct system as a bucket with small holes. The fuller you fill it, the more you lose. Typical trouble spots include:
Most of these problems are easy to catch with a walkthrough before the appointment. A contractor who checks their own work first can save everyone a return trip.
Passing a test is only part of the payoff. ENERGY STAR notes that sealed and insulated ducts can ease uneven room temperatures and can reduce the amount of dust and household chemical fumes drawn into the system. It also warns that leaky ducts can contribute to backdrafting, where combustion gases from gas appliances are pulled back into living areas instead of leaving through vents. In a Sacramento summer, when air conditioners work long hours, a well sealed system helps more of the cooled air reach the rooms where you actually live.
Verification works best when it is planned like any other trade visit. Ducts are easiest to test and repair before insulation and finish work hide them, so talk to your contractor about scheduling around those milestones. Book the rater once the system is actually complete and running, not when the crew expects to finish. If several trades share the site, share the appointment date with all of them so nobody blocks attic access or shuts off power during the visit. A short call the day before to confirm everyone is on track can prevent a wasted trip.
Passing verification can also support your savings. SMUD offers up to $3,000 in rebates for qualifying heat pump heating and cooling systems installed by a qualifying contractor. Its guidance references passing Title 24 through HERS documentation and calls for any new ductwork to be insulated to at least R8. SMUD also offers seal and insulate rebates for air sealing, attic insulation and new ductwork through participating contractors. It notes that leaky ducts in attics and crawlspaces can account for 20 percent or more of a home’s energy losses.
Rebate availability and rules change, so confirm current details with SMUD and your contractor before you commit to a project.
A few questions up front keep the process smooth:
A failed result is not the end of the road. When a test does not meet the compliance threshold, the contractor must correct the system until it passes. Ask the contractor to explain exactly what failed, what was changed and when the rater can return. Keep written notes and copies of updated documents, since passing results are recorded in the provider’s registry.
Verification does not have to feel like a surprise exam. When you know which tests apply, prepare the ducts and equipment, and keep everyone on the same schedule, the visit becomes a simple confirmation that the work was done right. California’s shift to the ECC Program changed the name and some procedures, but the goal remains the same: making sure efficiency measures work in the real world. Start early, communicate clearly and treat the rater as a partner in delivering a comfortable, efficient Sacramento home. Small steps taken before the appointment are what turn a stressful test day into a routine one, and they protect both your schedule and your budget.